【 abstract 】 as people life level, what living environment asks is more and more high, for hydropower installation project bring new tasks and new challenges. And as the whole building engineering important part of the hydropower installation engineering quality is essential, once appear quality problem not only relationship hydropower installation project but also will affect the whole project quality. According to the analysis of the status of quality hydropower installation engineering problems, and connecting with the reality of preventive measures are reasonable Suggestions.
【 key words 】 hydropower installation engineering quality problem preventive measures
中圖分類號:TV547.3 文獻標識碼:A文章編號:
前言
水電安裝工程不但是整個工程重要組成部分,其質量優良還關系著以后建筑投入使用的質量。隨著建筑事業高速發展,各種項目逐漸增多,各個施工單位對水電安裝工作質量越發重視。就目前水電安裝工程質量現狀來看,仍然存在諸多急需完善與改進的問題,比如滲堵的排水、漏氣等等質量問題,都會給使用人們帶來極大不便,因此探討水電安裝工程質量問題具有實際意義。
水電安裝工程質量問題
在整個建筑之中,水電安裝工程質量至關重要。但是從實際情況可知,目前水電安裝工程質量存在較多問題,本文就結合現狀探析水電安裝工程質量存在的問題。
2.1,對水電安裝工程的質量重視不夠
目前施工中存在一個普遍現象就是施工企業認識上存在誤區,片面認為建筑主體比較重要,而水電安裝工程隨便怎么都可以,只要過得去就行了。對進行水電安裝具體施工時,許多企業都將這項工程分包出去或者轉給其他的施工隊伍,一旦遇到分包隊伍或者轉包單位缺乏相應資質,或者沒有一個嚴格標準,勢必導致質量問題出現。有一些水電安裝施工人員素質差,而且技能上也僅僅略懂一二,對水電安裝要點及流程都不熟悉,都會出現質量問題。比如給水管道安裝過程中,安裝不到位,造成的滲漏;預埋管線預埋定位不準確造成管線在澆筑混凝土樓板或砌筑墻體時突出地面或墻面等等。筆者就遇到一個施工隊伍,居然連強弱電線路都走錯。
2.2,缺乏科學的管理
對工程施工進行科學管理是確保水電安裝質量重要舉措,但是在現實之中許多監理根本就沒有盡其管理職責。有時候施工隊伍沒有按照流程操作,監理也視而不見,其管理僅僅流于形式,致使施工人員在安裝電線通路及排水管之時缺乏規范性,致使水電安裝工程質量下降。
2.3,水電安裝與土建不配合
事實上,只有土建和安裝兩個程序緊密聯系,協調配合才能增強水電工程質量。但是現實之中卻不是這樣,許多土建施工人員根本就沒嚴格按照圖紙,該預留空間的沒留空間,導致水電安裝施工中不得不再次鑿墻挖洞埋設管道,勢必破壞建筑物原本的結構,為未來的使用者帶來安全隱患,這種現象應該是目前導致水電安裝質量問題主要原因之一。
2.4,一些特殊問題
1)安裝排水管問題;在水電安裝中,排水方面出現的問題基本集中在漏水、滲水及堵塞。漏水與滲水問題大都集中在水管的質量上,但是有一些土建不符合規格導致低級不均勻,可能讓水管受力不均勻出現破裂而漏水或滲水。而堵塞根本原因在于排水管內部清理不到位,施工之時施工人員又沒有進行通球試驗,安裝之后出現了管道堵塞。
2)安裝電氣問題;水電安裝工程中,電氣也經常出現問題的一個重要方面,具體表現在如下幾個方面:
①設備材料的質量不符合標準;現在很多施工隊伍和賣設備商人都有聯系,購買一套就提多少成。因此有時候就會混雜進去一些不合法標準的電氣設備,必將造成水電安裝質量出現問題。還有一些是采購時麻痹大意,沒有嚴格審查材料來源及質量,流入一些不符合要求的設備。這些設備安裝好之后,必然會帶來安全隱患。
3,水電安裝工程質量防范措施
確保水電安裝工程質量就是保障整個建筑質量,因此必須要從水電安裝存在質量問題入手,做出相應的防范措施。
(1)嚴格審核施工圖紙;施工之前必須要嚴格審核水電安裝圖紙,這是施工中一個比較重要的工作,這項工作做得是否到位直接關系著水電安裝質量。在審核圖紙時要按照相關標準,仔細查看各個部位設計是否科學,盡量發現存在問題并且及時修改與解決。因為這個時候出現了問題,修改是十分便利的。筆者在審核圖紙時曾經發現安裝水管位置與現場有差距,及時到現場核實并做了修改。
2)對控制技術進行交底;在施工之前就要對所有參數施工人員進行技術交底,讓他們對整個工程基本情況做一個了解與掌握,比如技術要求、工程特點、施工工藝以及質量標準、安全措施等等。這樣就可以讓施工人員明白自己負責工作更加明確,心中對各項技術有數。
3)設計施工方案;水電安裝不同于其他工程,它具備了一定功能性與多方關聯性,安裝之時要求較高材料質量,同時還要求嚴格的技術要求。根據這些特點,就要合理設計施工方案,對設計的設備、管材等都要做出具體說明。
4)控制設備及材料質量;無論是那種工程施工,第一道關口就是設備與材料的質量,這是確保水電安裝工程質量的首要條件。
5)控制水電安裝過程的質量;控制水電安裝過程的質量,是確保整個工程整體質量的重要依據。在該過程中,一定要熟悉整個安裝工藝與流程,嚴格要求施工人員按照施工上的要求進行施工,切實做好電力施工各個項目,比如布線、安裝插座以及安裝排水管道等。并要及時進行試驗,不合格就要進行檢修甚至返工。本文就以兩個例子進行適當闡述。
①家庭里電器使用的布線要使用中策BV單股銅線,接地線采用bbr軟銅線。穿PVC走向要做橫平豎直,沿著平頂的墻角走。管內的布線不能夠有接頭、扭結等,如下圖:
圖1水電安裝施工
②電視線、電話線安裝的時候千萬不能夠封閉或移動,還要嚴禁導線與弱電線安裝在同一個管道中,管線均要從地面直墻角過,如下圖:
圖2 水電安裝施工
③對于水電安裝工程來說,安裝電線非常重要,因為電線中有低壓照明電。安裝的時候一定要做好區分,不然造成短路引發火災,對生命、財產都會造成威脅。具體安裝如下圖:
圖3水電安裝施工
6)制定出完善的工程質量控制標準;必須要制定出完善嚴格質量管理標準,根據質量管理措施進行實施,必須要明確施工人員所負責質量標準,嚴格按照規定進行作業。而且完工驗收時,還必須對相關開關、配電箱、插座、燈具以及給排水管道等進行驗收,發現了不符合要求的地方馬上進行整改甚至返工。
4,結束語
隨著人們生活質量增強,工程的高質量是發展趨勢。因此必須要根據現狀分析出水電安裝工程質量存在的問題,并有針對性的制定出相應的防范措施,提高水電安裝質量為人們營造一個安全可靠工作生活環境。
【參考文獻】
[1]方炳.淺論建筑水電安裝的質量控制方法[J].價值工程,2010(1):69-72.
[2]趙成.淺談水電安裝工程質量控制的幾點意見[J].土木建筑學術文科,2010(14):395-398.
[3]梁玉升.淺析建筑水電安裝工程質量控制要點[J].城市建設理論研究,2011(14):165-167.
篇2
關鍵詞:建筑;水電安裝;質量管理
Abstract: Water and electricity installation engineering and people's production and life are closely related, how to ensure the construction of hydropower installation quality, which will be of important significance. This paper analyzes the construction and some problems with the installation in the process of construction, and put forward the existing problems of hydropower installation quality management measures.
Key words: construction; hydroelectric installation; quality management
中圖分類號:TL372+.3
建筑水電安裝工程質量影響著人們的工作和生活,對建筑工程質量有著長期的影響,是建筑工程質量的一個比較重要的組成部分之一,對于水電安裝工程質量管理國家和地方都相繼做出了一些規定,但是在目前的建筑水電安裝工程中還存在著一些質量問題。本文主要分析了建筑水電安裝工程施工過程中存在的一些問題,并且針對存在的問題提出了水電安裝質量管理的科學措施。
1 建筑水電安裝質量存在的一些問題
近年來,隨著我國建筑行業的快速發展,有些施工單位為了按期完成任務,對建筑工程的質量有所忽視,這樣也就造成已經交付使用的建筑工程項目排水、電氣工程存在著漏電、開光不靈、滲、漏、堵等方面的質量問題,這些問題不但造成能源的浪費,而且還對建筑工程的使用造成一定的影響。筆者根據自己在施工工程中的一些體會,對建筑水電安裝工程質量管理方面進行如下分析。
1.1建筑水電安裝工程中的電氣質量問題
建筑水電安裝工程的電氣質量方面的問題主要包括燈具沒有很好地固定、地線連接不做壓接、安裝的電氣開關不符合標高、配管與配箱連接方法不符合要求、在施工的過程中沒有科學使用設備和材質等等。造成燈具沒有牢固固定、地線連接不做明敷護套管槽、壓接,主要原因是燈具在安裝時貪圖便宜使用了不合適的連接方法、使用了木楔以及管槽敷設造成。
1.2建筑水電安裝工程中排水質量方面存在的問題
給排水質量問題是建筑工程水電安裝質量問題中比較常見的問題之一。建筑水電安裝工程中的給排水質量問題主要是:給排水管滲水、漏水;支架不全或者松動;給排水管的安裝位置不符合要求;給排水管道堵塞等等。引起這些問題的原因主要有以下幾個方面:由于地基的沉降不均勻從而造成下水管斷裂、滲漏;施工中所用的給排水管厚度存在不均勻現象,有些還存在砂眼或者裂縫;建筑水電安裝工程中安裝不完全按照規程造成承插接口不密實、有縫隙等等。
2針對建筑水電安裝工程質量存在的問題應采取的質量管理措施
2.1認真做好建筑水電施工所用設備和材料的質量管理
水電安裝施工過程中所用的設備和材料是保證水電安裝工程質量的重要條件,做好水電安裝工程質量管理首先就要做好設備和材料的采購和選型,如果設備和材料存在問題在水電安裝施工過程中是不能進行彌補的。施工人員要在管材進場時應當認真與工程監理做好配合,做好管材的抽檢工作,努力做好施工設備和材料的質量關,進場的管材不合格的不得使用,不得進場,做好驗收工作以及復試工作,進場的設備和原材料必須符合相關的國家規定,在質量、規格、型號、材質等方面必須符合設計的要求,并且要有出廠合格證。例如絲扣不能出現損傷,管壁的厚度應當均勻一致而且偏差也應當在一定的范圍以內,管道不能有砂眼和裂縫現象。要嚴防衛生器具接口不合格的情況發生,塑料管閘閥一定要避免關不嚴的情況發生,應當使用再生材料,鍍鋅管內部也一定要鍍鋅。經檢驗不合格的材料應當采取降級處理、拒收或者及時予以糾正。
2.2認真做好施工圖紙和施工方案的審核工作
在建筑水電安裝過程中,認真對施工方案和施工圖紙進行審核是以后安裝工程順利進行的重要保證,也是技術準備工作非常重要的內容。通過認真對建筑水電安裝工程施工圖紙和施工方案的審核可以為進行修改做好準備,對于存在的問題可以很好地得到解決。建筑水電安裝施工圖紙是進行水電安裝施工的重要依據和前提,要認真對施工圖紙進行審核,要做到對施工的各個階段有所熟悉,一旦出現問題能夠及時進行糾正,使水電安裝工程質量得到科學管理。根據水電安裝特點,主要從以下幾個方面進行審圖:①要認真核對系統圖是否與平面圖一致,管線的交叉、管線的標高以及坐標是否符合規定,是否存在漏、碰、錯的情況,對不明白的地方以及錯誤的地方要及時向有關單位和設計院聯系,共同找出科學合理的解決方案。②審圖應按照工程特點分項進行,再對各分項之間進行分析看是否存在問題,然后再審查分部工程之間有沒有矛盾,最后要做的是把審查出的問題進行討論,制定出科學的解決方案。③收到圖紙后首先對圖紙完整情況進行核對,從而避免窩工的現象發生。對水電安裝設計圖紙進行查看是否符合技術標準和規范規定。認真做好施工現場的預埋、預留工作,在實際的施工過程中,要根據詳圖進行預埋、預留工作,并且要做好檢查。
施工圖紙應當按一定順序進行科學地編制,但是由于設計人員在利益的驅使下,造成設計出來的圖紙質量不好,再加上一些設計人員專業技術水平有限,再加上審核人員不認真,設計出來的施工圖紙質量就不可能很高。為了避免在建筑水電安裝施工過程中出現問題,在水電安裝施工前應當把圖紙中的存在問題消除。建筑水電安裝項目主要技術負責人要對圖紙親自進行審核并將意見提交到圖紙會審小組進行討論,然后與甲方和設計院進行協商、討論,從而實現問題的解決。如果通過會審需要對原圖紙的設計進行修改時,要認真做好標識,例如修改日期、修改人、修改依據。
2.3認真做好建筑水電項目施工工程中的質量管理
2.3.1認真做好技術交底工作
建筑水電安裝施工進行技術交底的主要目的是水電安裝的施工人員對施工對象的技術安全措施、質量標準、施工工藝、技術要求、結構特點、設計情況等方面做一全面了解,從而有效避免操作錯誤和技術錯誤。進行水電安裝項目施工技術交底主要是把水電安裝工程施工注意事項、特點、要求、意圖等問題,另外還有為施工應采取的技術措施、制訂的技術方案,應當全部向施工工人和技術人員進行詳細的交底,例如施工要求達到的質量目標、卡子的距離和形式,連接方式,垂直度,管道坡度等都要有詳細的要求。這樣施工的任務得到了明確,水電安裝工程的質量有了保證。
進行技術交底要有針對性,要針對工藝設備、工程的特點,真正做到能夠指導施工。工長最直接的工作也就是技術交底,交底時決不能用“按照驗收規范、設計圖紙施工”的語句進行技術交底,而是應當對控制點有所把握,例如管線安裝時注意的防腐、坡度、支托架形式、架、固定卡、連接方式等寫清楚,同時還要做出一些規定要求操作者按這些要求去操作。在進行技術交底時還應當對質量等級寫清楚,避免返工情況發生。
2.3.2確保建筑水電安裝工程嚴格按照規范要求進行施工
在建筑水電安裝過程中,要保證水電安裝工程的質量,要定期進行施工質量檢查,對于施工中存在的問題進行及時的糾正,保證水電安裝施工質量符合設計要求,施工人員應當按照有關要求進行施工,并且要認真做好質量驗收工作。建筑水電安裝工程主要涉及到的施工質量標準主要有以下兩個:①給排水管道質量施工標準。管道與管道、器具與管道連接應嚴密,不允許有滲漏發生;給排水管安裝與燃氣管道、電源的距離不得小于50mm;管道的坡度設計要符合有關要求;在管道的螺紋連接處一部分應當設置管卡并且要牢固安裝,25mm以下管徑的給排水管道在管道終端100mm處、角閥、水龍頭、水表處必須加以固定。②電氣施工質量標準。燃氣管與電氣開關接頭間的距離要大于150mm,燃氣管道與導線的間隔要大于50mm;線路連接必須正確,電線的離地的高度要大于200mm,落地插座必須有較好的保護蓋板,電器連接要可靠;對于有地線插孔的插座,面對電源插座,插座右孔接火線,左孔接零線,地線孔在正上方。
參考文獻:
[1]朱笑.水電安裝工程管理與施工質量的措施[J].城市建設理論研究,2011(16).
[2]韓冰.水電工程質量管理要素分析[J].城市建設理論研究,2011(35).
篇3
【關鍵字】水電安裝;工程質量;預防控制
引言
隨著社會經濟的飛速發展,對于居住環境居民也開始提出更高的要求,尤其是在建筑水電安裝方面,對于建筑工程質量來說其是非常重要的組成元素之一,它與居民日常生活品質有著十分緊密的聯系。本文就將分析探討安裝過程里面質量影響因素和問題,并且對這些問題提出相對的措施進行控制。
1、控制水電安裝質量的意義
隨著改革開放和市場經濟在我國的不斷深入和快速發展,現在社會上的基礎建設項目呈現出持續增長的態勢。質量控制在整個水電安裝工程之中被貫穿,內容涉及著很多方面。對于控制安裝工程之中的施工質量,我們要將“質量第一”這四個大字牢牢地記在心里。但是,有部分企業為了將自己公司的經濟利益擴到最大,對水電安裝工程之中可能存在的問題不夠重視,忽視對其的控制和監管,導致一些嚴重的工程安全事故發生。這在某種程度上,不但讓居民的日常生活受到一定安全隱患,還讓國家承受了重大的經濟損失。鑒于這些原因,必須對安裝工程之中的施工質量加大力度進行控制,盡量對施工能夠達到預期的質量目標加以保證,才能保證我國經濟發展得穩定、快速和健康。
2、水電安裝工程施工質量中的影響因素
2.1人員
施工人員所擁有的整體素質,是水電安裝的關鍵,它是影響工程完成之后質量到底如何的重要因素之一,在工程的進行過程之中,人為操縱這個因素貫穿著所有的環節,所以,把施工人員的專業技術和道德政治素質加以提高是非常有必要的,因為“想要生產的產品擁有高質量,生產的人才也必須擁有高質量”。但實際施工之中,因違背規章胡亂用電而導致重大事故的案例并不少見。因而使用素質低下的工作人員不但讓工程得不到質量保障,更會威脅到人民的生命財產安全。
2.2施工工具、方法以及施工機械
第一,要對施工方案以及施工方案的設計還有制定施工工藝的合理性進行確立,一些水電安裝工程經常盲目的進行施工,施工設計方案并沒有進行細致的可行性研究。這樣的工程在施工進度上相對緩慢,工程完成之后的質量也很難得到保證。因此,但我們在制定水電安裝工程相關施工方案的時候,必須和最先進的水電安裝技術加以結合,并事先對設計方案進行一系列的可行性研究和綜合性評定,以能夠對工程質量實施有力的保障。第二,對機械工具、設備進行合理的使用和選擇,這也是重要的施工質量保證因素之一。在使用和選擇機械設備的時候,我們需要對幾個方面進行綜合性的考慮。首先,技術的先進性,只有采取最先進的技術手段,才能保證機械設備的優越性和高效性,從而使施工效率得到極大的提高。其次,實用性是否可靠,在使用設備的過程里面,我們首先要保證設備是可靠安全的,才能保證施工工序可以進行得順利。最后,是否經濟適用,就需在保證設備可以滿足施工要求和技術要求的基礎之上,用最小的成本換取最大的利益。
3、容易出現在水電安裝工程之中的質量問題
首先,在現代社會的水電安裝工程之中,因為大部分施工員工都只有非常淺薄的質量安全意識和社會責任心,所以經常會有安全事故的發生,而造成這些事故的原因,很大部分是員工操作并沒有按照規定的規章制度和安裝流程進行。其次,有一部分開發商為了把施工成本降到最低,獲取更多的經濟利益,選用材料的時候以次充好,購買質量根本無法過關的管材,最后使得管道使用不久之后就出現破裂或者生銹,給居民的日常生活帶來了很大的麻煩,部分用戶還因不滿對此進行投訴。再者,更應引起我們重視的是,為了成本的節約,有些開發商在引進施工人員的問題上,并沒有對從業人員是否專業進行考察,有些施工人員在水電安裝施工的相關專業問題上根本了解不多,為日后水電工程施工埋下了重大的安全質量隱患。除開這幾點之外,在施工中還要很多問題需要注意,比如多支亂穿線、操作不能規范、不作護口、一管多股等,都要被重點注意。
4、控制水電安裝施工質量的措施
4.1加強人員培訓,提高其綜合素質
水電安裝工程的各項工作都不能離開人的操作,因此,在施工過程之中,人扮演著非常重要的角色。在控制水電安裝工程時,施工企業需要對施工人員定期進行思想政治以及技能方面的培訓,使施工人員的技術水平和整體素質得到提高,降低發生安全事故的機率。除此之外,企業還需要對管理方式之中的質量責任制進行落實,也就是說把具體責任分配到具體個人,使每個人有明確的責任范圍、施工標準和質量職責,對于操作違規的人堅決給予其嚴厲的處分和懲罰,堅持防范可能出現的問題,使水電安裝工程日常運作得到保障,這也能對人民的生命財產安全加以保證。
4.2使監理機制得到完善,讓監理水平得到提高
項目監理在工程之中扮演著一個極其重要的角色,它不但可以使外行人對工程進行管理造成的不良徇私現象得到避免,同時也可以避免施工人員在工程中擅自違背施工程序以及偷工減料的問題。因此,工程監理在工程中的作用應該被我們所重視,而水電監理大部分的監理工作通常都是和施工工程同時進行的,在工程最后的完工階段,監理人員不但要配合質量監督、建設部門以及設計部門依次驗收,還應該對這段時間的工作進行分析和總結,方便以后能夠更加順利有效的開展監理工作。
4.3用現代化技術控制施工質量
現代社會可以用信息技術爆發來形容,在此,我們應該對現代科學技術進行充分的利用,以此作為有效管理現代施工企業的手段。根據調查顯示,參與建設項目的任何一方在工程完工的時候手中所掌握的被記錄在案的有效文件都不到總共的65%,所以在今天這個高速發展的信息時代,我們必須對信息技術進行充分的了解,爭取能夠有效、科學的對建筑項目進行控制和管理。
5、總結
在現代社會競爭如此激烈的今天,建筑企業只有保持工程項目的高質量完成,才能夠在市場上使自己處在不敗的地位。除此之外,我們也應該重視和注意建筑工程施工中每個環節的質量和安全問題,爭取有效保證施工項目能夠有效順利的進行,并且使施工人員的安全意識得到提高。對水電安裝工程來說,其施工的質量是非常重要的,同時也是一個重要的管理問題,我們要一直站在企業的角度看待這個問題,為企業的長遠發展和生存考慮,要將以質取勝作為經營戰略,并以此來推動建筑企業施工水平更快更好的發展。
參考文獻:
[1]周晶.芻議建筑水電安裝工程施工質量控制[J].城市建設理論研究(電子版),2011, (31).
[2]張林榮.試論建筑水電安裝工程技術問題與預防措施[J].城市建設理論研究(電子版),2011,(36).
[3]黃樹林.水電安裝工程質量控制[J].城市建設理論研究(電子版),2013,(15).
[4]王宏飛.淺談建筑工程中水電安裝之施工管理[J].中華民居,2012,(2):194.
[5]游曉軍.建筑水電安裝工程技術發展中的問題及對策[J].城市建設理論研究(電子版),2013,(14).
篇4
關鍵詞:建筑;水電安裝工程;管理
中圖分類號:TV211.1+4 文獻標識碼:A
隨著改革開放的深入發展,人們的生活水平有了顯著的提高,對生活質量的要求也越來越高。在已經交付的建筑項目中,很多建筑物都存在著給排水和電氣工程的滲漏、堵塞或者漏電等問題,這些質量問題的存在與建筑水電安裝工程疏于管理有著直接的關系,降低了使用者的生活質量,造成了很多不必要的麻煩。相關管理人員應當重視建筑水電安裝工程的管理問題,加強各個環節的質量監督與管理,為用戶提供更多地方便。
1.建筑水電安裝工程存在的問題
隨著建筑工程項目的增多,水電安裝工程施工項目也逐漸增多,我國建筑水電安裝技術在不斷提高,但是,在安裝施工過程中也存在著一些問題。例如室內水電管道壁厚度不夠,管徑太小,開關不靈活以及預埋引入管設置不合理等,這些問題的存在直接影響到建筑物的整理質量。
在水電安裝工程中,在安裝布置室內管道和衛生間器具時,難以避免出現滲漏的問題,其原因主要是由于衛生器具尺寸不達標、施工人員認為誤差、管道配件不符合要求等引起的。在整個工程施工中,室內地漏、清掃口、檢查口等的安裝布置是其中重要的環節,這些部位很容易發生堵塞現象,而造成其堵塞的原因主要是由于地漏標高設計不合理、未設置水封、與墻面距離不符合要求等引起的,這些問題的存在導致房屋內積水無法正常排出,直接影響到用戶的使用質量。在敷設電氣工程的管線時,往往會出現絕緣導管連接套管的管徑不合適、管口尺寸不達標、保護層過于薄以及管線缺乏牢固性等問題。這類問題的出現直接影響到了水電工程的順利施工,給居民造成一定的安全隱患。另外,在安裝電氣設備時,也可能出現配電箱箱體與設備進出管線布置雜亂無序、沒有穩定固定電氣設備等這些問題的存在,都將直接影響到建筑物的整體質量,降低居民的生活質量,為居民的生活帶來了一定的安全隱患。相關部門應當及時發現建筑水電安裝工程中存在的問題,加強施工的管理工作,提高建筑水電安裝工程的施工質量。
2.建筑水電安裝工程管理策略
建筑水電安裝工程的有效管理直接影響到建筑物的使用質量,相關單位應當加強施工項目的組織管理,建立完善的質量管理制度,在制度的約束下,確保每位施工人員都能夠按照相關標準要求進行施工。
2.1安裝前期管理工作
建筑水電安裝工程的前期管理工作是整個安裝工程能否順利進行的關鍵環節。因此,相關管理人員應當充分做好建筑水電安裝工程的前期管理工作,包括審核施工圖紙、材料管理和控制以及技術交底等管理工作。
建筑水電安裝工程的施工圖紙效果如何,直接影響到施工的后續環節。做好施工圖紙的審核工作,應從以下幾方面入手:首先,要審核施工設計圖紙是否與國家相關政策規定相一致;其次,審核施工設計圖紙中的建筑結構、管線設置以及樓板厚度等是否滿足安裝要求;最后,審核圖紙上的尺寸、坐標、各種刊、卡架形式以及管道材質、連接等是否符合標準要求。確定圖紙設計符合各項標準要求后才能進行施工。做好材料的管理工作,檢查安裝材料是否符合質量要求,嚴格把好材料的質量關,確保安裝設備和材料具備合格證,符合安裝需求,對于質量不達標的產品要及時清退,以免投入使用后影響到安裝工程的質量。在前期管理工作中,還要加強技術交底工作,工作人員要及時與相關部門進行溝通和協調,綜合分析工程的重點和要求,全面掌握安裝設計方案,對施工人員進行技術交底,將施工方案、技術措施等詳細的向施工人員說明,使其明確自身在安裝工作中的任務和需要注意的問題。
2.2施工過程的管理工作
建筑水電安裝工程的施工過程是整個管理工作的重要環節。在水電安裝工程施工的過程中要加強以下幾方面的管理工作。
首先,加強電氣配管工程的質量控制,注意土建鋼筋綁扎要與配管安裝同時進行,確保配管在隱蔽狀態下,才能進行砼澆注。在檢查二次預埋預留樣板時,要注意檢查室內開關、插座、弱電終端接口的數量,查看其是否符合建筑裝飾和房間使用的要求。還要注意檢查管道路線是否按照施工圖紙要求進行合理布置,線盒的埋設深度是否符合要求等。其次,在檢查交房樣板時,要注意查看開關、插座等于建筑裝飾的位置關系,衛生間、廚房以及陽臺等部位的給水管道預留情況。檢查地漏水封高度是否符合相關要求,對廚衛通風設施、空調室外機擱置的位置以及公共通道給水管道等的安裝施工情況進行檢查。最后,要注意管理與控制電氣配線工程的施工質量,重視重視螺口燈頭、插座、零線與相線接線,還要注意相線與零線的方向,避免接反現象的出現,注意左零右火和上零下火的接地要求。這些細節管理問題都將直接影響到水電安裝工程的質量,相關管理部門要做好相應的管理工作。
2.3工程竣工后的管理工作
建筑水電安裝工程竣工后,同樣需要涉及到一些必要的管理工作。相關管理人員要注意在工程竣工階段,配合設計單位、建設單位和質量監督部門做好驗收工作,對該工程的整個施工過程進行驗收和總結。
3.結語
總而言之,建筑水電安裝工程是建筑工程的重要組成部分,相關管理人員應當認識到水電安裝工程的重要性,做好安裝工程的管理工作。管理人員要從施工的整個過程入手,做好每個環節的管理工作,確保建筑水電安裝工程的質量。
參考文獻:
[1]甘向陽.水電安裝工程常見問題及質量控制探析[J].科學之友,2010 (14):117-119.
[2]黃炳祥.論小區住宅水電安裝工程質量控制及防治措施[J].科技創新導報,2009 (23):123-125.
篇5
關鍵詞:建筑工程;水電安裝;質量管理
中圖分類號:TU758 文獻標識碼:A 文章編號:1009-2374(2014)05-0049-02
近些年來,建筑產業的發展速度越來越快,在多種因素的綜合作用之下,比如工期較短等等,這樣就會影響到建筑工程水電安裝的質量,在已交付使用的水電安裝工程中,出現各種各樣的問題,比如開關不靈、漏電、滲水等等,這樣就會對建筑的使用功能產生影響,不僅會影響到人們的正常工作和生活,還會對建筑的使用壽命產生影響。
1 施工圖紙的審核
在建筑施工水電安裝工程的技術準備方面,非常重要的一項工作就是水電安裝設備的詳細審核,要知道,審圖工作的質量,將會對安裝工程的施工產生很大的影響;如果在施工圖紙的審核中出現了問題,那么就需要采取一系列的措施進行修改和解決,盡量要在施工之前完成這項任務。具體來講,圖紙的審核需要注意這些方面的內容:一是保證設計圖紙沒有違反國家相關技術政策和規定;二是保證設計的合理性,保證建筑的各個部分都可以協調配合,沒有矛盾存在,并且在管井尺寸、樓板厚度等方面也需要符合相關的安裝規定;三是設計圖紙與施工技術裝備條件要相符;四是對建筑施工中使用的材料進行審核,保證其在規格、數量以及品種方面都沒有問題;五是要保證有清楚、明確以及齊全的圖紙說明;保證設備層以及墻壁上的預留洞、套管數量符合要求;保證正確的標高和尺寸;選取的是合理的管道材質以及連接方法;專業之間的管線不存在矛盾以及交圈的問題;在管道、器具以及設備的固定方面沒有出現問題,卡架的形式符合相關的要求;結構足夠的牢固;有著十分明確的試壓標準、測試標準以及檢驗標準等等。六是依據分項工程來進行審圖,在水暖方面通常是由導管立管開始,然后向器具設備等逐漸延伸;在電氣方面,接地、干管、層盤等是首先審核的對象,然后分別是器具和設備,并且保證沒有矛盾存在于審查的各個分項工程之間;如果在審核中發現了問題,需要大家一塊兒討論,找出最優的解決方法。
2 技術交底
眾所周知,技術交底的意義在于讓所有參與項目施工的人員可以詳細的了解施工對象的具體情況,比如設計細節、技術要求、結構特點以及質量標準等等,這樣以往經常發生的技術錯誤或者操作錯誤都可以得到很大程度的減少。因此,就需要做好技術交底的工作,讓參與施工的工作技術人員熟悉工程設計的具體內容以及需要注意的事項,同時,掌握具體的技術措施以及施工方案等等。這樣各個工作小組都會明確自己的任務和職責,采取正確的施工技術和措施,來保證水電安裝工程的質量。
3 施工方案的設計
相較于一般的建筑工程來講,水電安裝工程具有一些不同的特點,比如工程多方關聯性較強,有著較強的功能系統性;工程質量會受到設備材料質量很大的影響;此外,還有工程施工作業有著較高的要求以及較差施工難度較大等特點。
因此,在設計施工方案的時候,就需要將施工特點充分的納入考慮范圍,依據施工規范和驗收規范,來對管材以及其他的附件和設備的選用進行說明,同時,在施工方案中還需要加入其他一些內容,比如工藝的流程、質量標準、連接敷設的方式以及允許存在的偏差范圍等等。
4 加強材料以及設備的質量控制
通過上文的敘述我們可以了解到,水電工程的質量會在很大程度上受到設備材料質量的影響,因為如果設備自身存在了問題,那么在安裝施工的過程中,采用任何措施都是于事無補的。因此,要想控制水電安裝工程的質量,非常重要的一個方面就是做好設備材料選型以及采購等工作。管材進場時,施工人員需要對材料進行必要的抽樣檢驗,保證原材料以及設備進貨的質量,要保證進場的原材料以及設備擁有必要的質量合格證明,同時,材料和設備的材質、型號以及規格等與設計的要求相符合,產品性能方面既可以滿足工程的要求,又符合國家相關的技術標準。認真的驗收和復試進場管材,如果在驗收中發現了產品不合格,需要采取一系列的措施進行解決,比如及時糾正、降級使用、退貨索賠等等,這些存在問題的產品是不允許進入施工現場使用的。比如,在管道方面,需要保證裂紋、砂眼等問題沒有不存在,壁厚的偏差在規定的范圍內,沒有損壞現象存在于絲扣中。管材有著十分均勻的厚度,要保證鍍鋅管內部鍍上了鋅,需要特別注意的是不能夠存在閘閥關不嚴以及衛生器具接口不標準的問題。
5 對施工全過程的質量進行嚴格控制
要想控制水電安裝工程的質量,非常重要的一個方面就是控制施工全過程的質量。而要想保證施工質量,則需要重視組織質量檢驗、不合格安裝產品糾正等工作。施工管理人員在施工指導時,需要嚴格依據相關的施工規范和施工要求來進行;項目管理人員在劃分各個工程質量驗收任務的時候,也需要嚴格依據相關的規范和要求來進行,既需要對批質量進行檢驗和驗收,還需要對分項工程、子分部工程等進行嚴格的質量驗收工作,不能放過每一個細小環節。
6 建筑施工企業水電安裝技術創新
在給水設備安裝方面:在安裝之前,需要核對檢查相關資料和合格證文件;結合相關的要求,對水泵房中的安裝位置以及縱橫排列形式進行合理的規劃;在布置機組時,需要保證是最短的管線和最少的彎頭,保證可以非常方便的連接管路,并且走道和空間也是需要留
設的。
在管道布置和安裝方面:管道可以分為明裝和暗裝兩種形式,明裝時,需要平行于墻、梁柱等輻射。在墻內敷設衛生設備支管;暗裝時,需要對管道及附件的安裝檢修可能性進行考慮,盡量避免水平敷設管道,一般采用豎向敷設的辦法。
在綜合布線方面:控制金屬線槽內導線總截面,要小于線槽內截面的百分之二十,如果是垂直或者傾斜敷設線槽,那么就需要采取措施來應對導線的移動。要將護口加設于金屬管段,在箱盒處設置導線接頭,如果電纜、封閉式母線及金屬線槽需要換過防火墻等,就需要進行必要的隔離。鍍鋅電纜橋架必須要有兩個以上有防松螺帽或防松墊圈的連接固定螺栓。可以將綁扎處理應用到普通電纜中,在綁扎主要電纜方面,還需要將電纜頭套加設上去。
7 結語
在建筑整體工程中,十分重要的一個組成部分就是水電安裝工程,如果在水電安裝中出現了問題,將會嚴重影響到建筑工程的總體質量,因此,需要引起人們足夠的重視。選擇合適的安裝工序,控制每一個環節的施工質量,保證建筑工程水電安裝的質量。本文簡要分析了建筑施工企業水電安裝的質量管理和技術創新,希望可以提供一些有價值的參考意見。
參考文獻
[1] 李啟興.建筑工程中水電安裝技術的質量管理分析[J].科技創新與應用,2012,2(11):123-125.
[2] 何光屏.淺談建筑工程中水電安裝技術的質量管理[J].城市建設理論研究,2011,2(26):76-78.
[3] 肖瑜.建筑工程中水電安裝施工的質量控制措施[J].城市建設理論研究,2011,2(18):34-36.
篇6
關鍵詞:水電安裝;問題;對策
Abstract: building hydropower installation is an important link in construction engineering, hydropower installation quality of good or bad relations with tenants, convenient and comfortable to live, Relationship with community residents living environment; Relationship with energy conservation and the overall quality of construction engineering problems. Hydropower installation project construction, the author of this paper some of the common problems were analyzed, and corresponding prevention measures are put forward.
Key words: water and electricity installation; The problem; countermeasures
中圖分類號:文獻標識碼:A文章編號:2095-2104(2013)
引言
在城市的不斷發展和社會的不斷進步下,人們對于生活水平、居住質量的要求越來越高。水電安裝作為建筑工程的重要環節,其安裝質量不但影響著工程的總體質量,還嚴重影響著人們的居住質量和居住舒適度。在水電安裝工程中存在著一些常見的質量通病,處理好這些問題,就能確保水電安裝工程的質量。
1水電安裝工程中的常見問題
1.1管道安裝的常見問題
管道安裝是給水、排水的關鍵問題,一般常見的問題有滲漏、堵塞等問題,給人們的生活帶來了極大的不便和煩惱。在施工過程中,第一,管道的質量問題易造成管道安裝的施工質量問題。如管道的易破裂、易生銹、管壁厚度不均勻等問題。此外,以次充好,將普通的排水管道用到建筑工地上等,嚴重影響了管道施工的質量。其次,排水管道安裝的坡度設計不合理,造成倒坡現象,造成管道的阻塞。再次,管道安裝時,地基的不均勻沉降為充分考慮,由于這一因素造成的管道斷裂、裂縫等問題會導致管道的滲漏、堵塞。第四,施工工藝沒能嚴格安裝規定進行。如鑄鐵排水管承插口用水泥漿抹口,連接螺母長短不一、閥門安裝朝向不正確、管道接口連接不緊密等。第五,屋面水箱預埋防水套管或防水翼環制作不標準。第六,衛生器具給水、排水配件材料質量不合格,造成了水管安裝施工的質量問題。第七,由于管道安裝的位置不合理造成流水噪音大,管道易發生共振等問題,影響了用戶正常使用。
1.2電安裝的常見問題
電安裝施工的質量不僅關系著用戶使用的方便性,還嚴重影響著使用的安全。電裝修施工的質量問題有可能埋下嚴重的安全隱患,因此在施工中一定要嚴肅對待。在電安裝施工中,主要的施工問題如下所述:
1.2.1材料問題
水電安裝施工中,安裝材料的不合格問題較為嚴重,特別是電安裝施工中,材料問題更為突出。第一,施工材料缺少相應的質量保證書。第二,施工材料入場把關不嚴,一方面是驗收人員不專業,缺少材料驗收的能力。另一方面是驗收不嚴格,施工材料質量問題得不到充分的重視。第三,因材料和配件的使用不當造成的材料損壞、材料性能難以發揮。
1.2.2管內穿敷電線安裝施工問題
在電安裝過程中,管內穿敷電線安裝施工關系著電路的安全使用,其中存在問題嚴重的影響著用電質量和用電安全。第一,管內穿過導線數量過多,易造成保護層的損傷、導線在導管中的交叉、糾結。第二,導線連接不正確。對導線的顏色不能明確分辨,造成線路安裝的質量事故;導線連接不安規定操作,造成導線連接的不合格,如接觸電阻超過限額等。第三,導線的保護層不能起到很好的保護作用。如管線戶口處未處理,造成穿線時導線絕緣層的損傷。施工設計不恰當,造成配線管等,易引起配線管的損壞。起不到相應的保護作用。
2.2.3電安裝的防雷保護設施的施工問題
隨著城市的發展,建筑工藝、技術等不斷的發展、成熟,人類的房子越蓋越大,越蓋越高,越蓋越精美,與此同時防雷問題也越來越嚴峻。電安裝的防雷保護施工存在的問題主要有以下幾個方面。第一,防雷保護線設置的太低,起不到防雷的作用,易造成雷電對建筑物和電路的損壞。第二,避雷線、電器設備的接地設計不合理,造成接地線的脫落、虛接,起不到排除電危險的效果。第三,接地體埋藏太淺或太深、接地體的間隔不夠、焊接面不夠、防腐處理不好等等,易造成防雷設施的虛設,起不到真正的防雷保護作用。
2.2.4電器設備安裝方面的問題
電器設備主要是指配電箱的安裝,在配電箱的安裝施工中一方面是對安裝施工的設計、分析不足,造成安裝是墻體的裂縫、設備工作時噪音大、外殼漏電等隱患。另一方面是配電箱安裝時箱蓋內的雜物未及時清除,造成了配電箱坐標的移位、變形等。此外,隨著人們生活水平的提高,人們對室內裝修的要求也在不斷提高,燈具、電器等的裝修也嚴重影響著水電安裝的質量,但在燈具安裝時,水電安裝施工人員大多不在場,電器的安裝很容易破壞水電安裝的施工成果,造成水電安裝的施工質量問題。
2水電安裝工程常見問題的預防措施
2.1材料問題的預防措施
材料是確保施工質量的基礎,因此,在水電施工中要嚴把材料質量關。第一,對入場材料進行嚴格把關,認真核實入場材料的質量保證書,審核材料質量的符合率,按要求對材料進行抽查。第二,重視材料的存儲和擺放,防止材料在施工前的損壞,避免因材料存儲不當造成的材料質量問題。如管道的日曬雨淋容易造成管道表面的損壞,影響施工質量。第三,注意施工技術和施工順序,嚴格安裝施工規則進行施工,避免材料在施工過程中的受損。
2.2管道的滲漏預防措施
管道的滲漏問題的預防,首先,要嚴格控制材料的質量問題,確保施工材料的合格,特別是對材料砂眼等微細質量問題的辨別。其次,要充分考慮管道的伸縮因素,避免因管道伸縮不足造成的管道斷裂、裂縫問題。此外,對管道的熱脹冷縮等問題也要進行充分的考慮,利用折角等技術做適當的類型補償,確保管道使用的安全、可靠。再次,注意施工工藝,水管的鏈接等施工要嚴格按照施工要求進行,確保施工的質量。同時,注重管道的鋪設布置,避免管道鋪設的雜亂無章,影響管道施工的施工質量。
2.2管道的堵塞預防措施
預防管道的堵塞,首先,要在施工前對管道進行清潔、疏通,確保管道內無異物。同時注重施工場地雜物的清除,避免雜物進入施工管道,影響施工質量。其次,嚴格按照施工工藝進行施工,確保管道施工坡度的適當性、科學性,促進廢水等的排泄通暢。同時,注意管道封口施工,避免封口時水泥漿、泥沙等進入管道造成管道的阻塞。再次,注重便池按照的合理性,第一,選擇合適的大便器,確保大便器與管道接口的通暢,同時注意大便器配件的質量,避免影響管道施工的總體質量。第二,在管道上設置檢查口和清掃口,及時清理管道的堵塞,避免管道的嚴重堵塞。第三,在施工過程中先將立管固定牢固后再進行與排出管的鏈接,確保排污管的通暢。
2.3電安裝施工的預防措施
第一,管內穿敷電線施工問題的預防措施。首先,管內穿敷電線安裝要嚴格按照規定執行,避免內置線路的雜亂、混淆。其次,內穿線路安裝要認真、仔細,避免因大意造成的安裝質量問題。如嚴格區分導線顏色,避免導線連接的混亂。又如施工時做好回路標記,確保線路安裝的通暢、安全。再次,及時查找漏戴,避免截面處理不全造成的導線劃傷。第二,防雷保護設施的安裝首先,要確保防雷帶、防雷針安裝的高度,確保防雷設施安裝的效果。其次,嚴格安裝防雷要求選擇材料和施工工藝,確保防雷設施連接的科學、有效,避免虛焊、假焊等現象發生。再次,注意防雷設施的接地距離,確保接地體埋地的適當深度。第三,配電箱的安裝必須經過科學的設計,并嚴格安裝設計進行施工,確保墻體的安全與配電箱安裝的正確、合適。此外,其他電器具的安裝必須有水電安裝人員到場后,才能進行施工。避免電器具安裝對水電安裝施工質量的影響。
3小結
水電安裝是建筑工程施工中的大事,水電安裝的質量問題是關系建筑物使用安全性的關鍵一環,水電安裝施工存在的問題,會給居住者、使用者的生命、財產安全造成嚴重的威脅。因此,在施工過程中必須確保水電施工的質量,嚴肅對待水電安裝中可能出現的質量問題,提高水電安裝的水平,確保工程質量,確保人們使用的安全、舒適。
參考文獻
篇7
關鍵詞:水電安裝 質量監控
隨著科技發展的日新月異,我國的建筑業也與時俱進,有了長足的進步,一些超高超大的建筑應運而生,人們對建筑質量的要求也越來越高,由于水電安裝工程直接關系到工程交付后各種使用功能,且涵蓋面廣,因此,水電安裝工程的質量控制在整個工程質量控制中起到了至關重要的作用。
1 施工前的質量控制措施
1.1 做好圖紙會審工作。圖紙會審是整個水電安裝工程質量控制的重要一環,要把在熟悉圖紙過程中發現的問題,盡可能地消滅在工程開工前,因此認真做好圖紙會審,減少施工圖中的差錯,完善設計對提高工程質量和保證施工的順利進行具有重要意。
1.2 制定詳盡切實可行的施工方案。施工方案是工程施工中質量控制的基礎,是指導施工的綱領性文件,施工方案一般以單位工程中的分部或分項工程或一個專業工程為編制對象、內容要契合實際,簡明扼要。它主要是根據工程特點和具體要求對施工中的主要工序和保證工程質量及安全技術措施、施工方法、工序配合等方面進行合理的安排布置。
1.3 進行一線作業人員培訓,提高施工人員素質。要加強對一線作業人員的培訓工作,提高質量安全管理意識,施工人員的素質是整個工程質量的關鍵因素,樹立質量第一,預防為主的思想,保質保量地完成水電裝置工程任務。可對質量管理、監督、檢測等方面工作人員進行執業人員資格考核,考核通過后執證上崗。
1.4 要嚴把材料設備進場關。進場材料設備要嚴格控制,嚴禁質量不達標的材料設備進入施工現場,而且允許進場的材料設備也要嚴格執行進場報驗程序,需要復試的,必須經過復試才能用于工程建設。
1.5 做好技術交底。施工前,要依據施工方案,對施工班組和上崗作業的施工人員做好技術交底,并要做好記錄。
2 施工中質量控制
2.1 防雷接地。防雷工程施工常見問題:①焊接的連接長度和焊接質量都不符合施工要求,焊接處存在氣孔、焊瘤、咬肉、夾渣、虛焊以及焊渣殘留等現象。②接地線的埋設深度不夠,室外埋設的接地線焊點處沒有刷防腐油漆。③接閃器和防雷網的支持卡子間距不符合要求,間距過大。④漏焊或錯焊了接地鋼筋網連接點,漏設了外引接地聯結點或檢測點預埋件。⑤用結構鋼材代替避雷針(網)及其引下線時,鍍鋅層因焊接而被損壞,也沒涂刷防銹漆;沒有處理好螺栓連接的連接片,導致片與片之間接觸不密實等。⑥引下點之間的距離過大,沒有在引下線跨越變形縫的地方裝設補償器,也沒設置保護管保護穿墻體的線路。接地體埋設的淺,或沒有對引出線進行防腐處理。⑦設備外殼、梯子、旗桿和管道等屋面金屬物沒有連接好屋頂防雷系統,或等電位聯結跨接地線線徑未達到要求。
2.2 吊頂內管線施工。由于在吊頂內需要安裝的專業隊伍比較多,往往造成吊頂內空間安裝不夠用,或擁擠不堪,要使吊頂內各管線綜合布置合理、美觀,施工前要綜合全面的考慮各個專業的施工,制定詳盡的施工方案,將各個專業不同的材料設備橋架,給排水管道,消防管道,自動噴淋管道,風管,空調水管各管線在同一張圖的各個圖層上重疊,從而分析出位置相同的各類管線之間是否存在矛盾沖突。并繪制出管線綜合布置斷面圖,再由各專業互相配合進一步做出合理的管線布置調整方案。
2.3 管路敷設。管路彎曲處的裂縫、折皺和凹穴等現象是檢查的關鍵點;另外要看是不是根據施工要求設計的管子彎曲半徑;同時確保進入箱、盒排管要安裝鎖扣、排列整齊,長度也要相等;應該將明配管路排列整齊,嚴格按間距、及位置要求平行或較差敷設蒸汽、熱力、煤氣和管路,同時配備隔離措施;檢查保護層是否足夠等。敷設鋼管過程中,必須剔除管內的鐵屑和毛刺,過口要平整光滑;施工單位必須按施工要求除銹防腐;根據施工設計,用金屬軟管引入設備的接頭、保護地線來連接設備和管路,用跟母和鎖扣連接箱盒和配管。
2.4 管內穿線:根據既定的質量要求、型號和規格選用合適的導線;管內雜物在穿線前必須清理干凈;要先穿線后配管,邊敷邊穿線;穿線后要封堵垂直向上的管口;注意在管內總截面面積中,管內導線總截面只占40%以下的比例即可;一條線路的導線是不是要從一條管路中穿過;管內導線是否分色或存在接頭。連接導線的過程中,操作人員一定要根據型號要求選用合適的接線端子和連接管,連接質量應符合施工要求,以確保其不松動和脫落;銅線要掛錫;包扎要嚴密,做好絕緣措施;剝皮時注意避免線芯被損壞;采取措施保護導線穿配電箱管孔;導線接頭要設置在接線盒里。
2.5 燈具開關插座等器具安裝:安裝位置是否符合要求;樓板預埋燈具位置是否在房間中心;安裝是否牢固;導線金屬孔是否有保護;燈頭相線是否反接;燈具離地面小于2.4m時,金屬外殼是否做好接地;進入吊頂內的燈具,金屬外殼是否做好接地;露天及潮濕場所是否選用防水燈具等。開關是否控制相線;搬把開關上下與方向是否一致;安裝位置標高是否符合要求;安裝位置與水源、煤氣距離是否滿足規定要求;潮濕場所是否選用防水型開關。廚房、衛生間插座是否選用防水防濺插座;抹灰是否污染開關、插座;開關、插座安裝是否牢固,是否用單一螺絲固定等。
2.6 配電箱盒安裝:選擇信譽良好的生產廠家,以確保配電箱盒的做工和質量都能滿足施工要求;金屬箱一定要做好防銹防腐處理;通過氣焊或電焊的方式開孔,必須保證一管一孔;在電氣箱內裝設消防器件。按施工要求合理設計箱、盒裝設的位置和標高;固定是否牢固;箱盒蓋板要嚴密,且墻面和箱盒應該保持平正;檢查金屬架和箱體是否存在接地現象;做好電器可開啟箱門的跨接地線,箱內配線不能有接頭;注意區分保護零線和工作零線的作用和適用范圍;零線和地線端子板是不是根據線徑要求已裝設好;明確標示配電回路名稱等。
3 施工后質量控制
3.1 及時做好系統調試及聯動試車。工程調試是鑒定系統設計質量、安裝質量及設備材料質量的重要手段,是檢驗各個系統正確性及設備性能能否達到設計控制保護要求的重要工序,是設備能否正常運行和運行過程中可靠性、安全性的關鍵。所以,必須加強系統調試組織和計劃工作,為工程順利竣工提供保障。
3.2 全面詳細的做好工程竣工資料。工程資料不但是記錄施工工序和實現科學管理的重要依據,是科學技術成果的儲存和信息傳播的寶庫,而且還是工程質量控制、驗收、交付使用和維修的重要檔案,是創優審核不可缺少的關鍵項目。
3.3 認真細致的做好質量檢查。工程各專業要根據相關的施工規范要求,執行施工質量檢驗制度,嚴格工序管理,按工序進行質量檢驗和最終檢驗試驗,并要在施工過程中做好自檢、互檢、專檢三檢制度。
篇8
【關鍵詞】建筑水電;安裝工程;質量通病;管理措施
在居民們的生活中,水電是不可或缺的一部分,能夠對建筑的質量起到非常重要的影響,是衡量建筑質量一個非常關鍵的標準。國家及地方上的有關部門也對此非常重視,在水電安裝方面制定了一系列的規定,然而在當前的水電安裝中難免還存在一些質量問題等待解決。
1建筑水電安裝工程的質量通病
1.1建筑給排水工程的質量通病
在所有出現的水電安裝問題中,給排水系統是發生問題最頻繁的,主要體現在:管道不通;給排水的安裝坐標尺寸沒有依照設計圖紙的要求進行,支架不穩,安裝不全面;給排水的管道出現滲水現象等。那么出現管道不通的根本原因是排水管道倒坡、在安裝過后沒有依照要求對其進行管道檢驗、在安裝管道的時候,沒有將其中的堵塞物清理干凈、在安裝完成之后,將施工工具遺留在管道內、未將預留關口封嚴。出現給排水安裝坐標尺寸問題的原因在于未采用專門的管卡進行加固、標高尺寸把握不精準和施工過程中采用的技術不一致等。而出現管道滲水的原因是材料的質量不過關,特別是管道銜接處不嚴密、采用的管道附件出現開裂或洞眼、管道的厚薄不一致;建筑地基沉降使得管道難以承受壓力,出現滲水現象等。
1.2建筑電氣工程的質量通病
在電氣方面經常出現的問題有:未依照設計圖紙的要求來選擇使用材料及設備、箱盒與配管銜接排列不工整、沒有依照規定來采用銜接的方法、沒有依照設計來安裝插座開關、地線銜接沒有進行壓接、明敷護套管槽和燈具沒有安裝牢固。而出現地線銜接沒有壓接、明敷護套管槽和燈具沒有安裝牢固的原因是施工方在安裝燈具和明敷護套管槽的時候采用的是木楔,并且為了節省精力采用了不恰當的連線方式。
2建筑水電安裝工程強化管理的措施
2.1加強施工圖紙和施工方案的審核
在進行水電安裝的時候,首先要做好準備工作,制定出恰當的施工方案及設計圖紙,有關單位要對其進行嚴格的審核,這樣能夠有效保證施工的質量。在對施工方案及設計圖紙進行審查的時候,能夠發現其中的不恰當之處,并且對發現的問題進行及時的解決。在施工中,設計圖紙起到了非常重要的作用,它是一切工作開始的基礎,有關部門要在施工前對圖紙進行嚴格的審查,將施工中的每個環節都了解透徹,這樣在遇到問題的時候才可以第一時間內處理妥當,保證水電安裝的質量。
2.2加強建筑給排水工程的管理
(1)解決排水管道漏水問題
計算排水管道的坡度以及建筑的下沉程度,并且對其進行分析,假如出現不恰當之處,要采取有效措施予以處理。如果排水管道的坡度不合理,要將其糾正過來。在鋪設地下管道的時候要對土壤進行檢查,不能將其安置在松軟的環境中[3]。在選擇材料和衛生器具的時候,要嚴格檢驗其質量,在投入使用之前,進行二次檢查,假如管道有裂縫或砂眼,應當及時和供應商反映情況,禁止不合格的材料使用到工程中;在使用鍍鋅管的時候不能采用焊接的方式,采用質量合格的鍍鋅配件;排水管道與配件的銜接應當是嚴密的,施工方在施工期間應當依照規定進行安裝。
(2)解決管道堵塞問題
在管道安裝結束后,應當將浴缸、馬桶等與排水管道連接的地方隔離起來,避免后期施工時垃圾掉入,堵塞管道。在進行器具的安裝前,應當先將管道清理干凈,保證排水系統的暢通,在清理干凈之后,再進行通球試驗,選擇的球要比管道的直徑小,在其四分之三左右是最恰當的,將球投入到排水口以后,往管道內注水,確保球可以通過管道,假如發生了堵塞,那么就及時進行清理。在實驗期間要將有關數據記錄下來,為后期的工作提供方便。
2.3加強建筑電氣工程的管理
(1)解決配電箱問題
在采用絲扣連接線路的過程中,應當用跨接的方式連接配管,并且要保證地線至少有五毫米。假如要進行焊接,應當確保焊接的質量,焊穿、焊瘤以及夾渣等問題都不許出現,焊接之后要清除余下的焊渣,用防銹漆來防止焊接處生銹。要確保接電線與電表箱的接地接頭是連接起來的,而不是與金屬外殼連接。直徑在五十毫米以下的鋼管一般都是用茲扣連接的方式,型鋼上不能放鋼管,鋼管口處如果有毛刺應當要處理,直到平整為止。在固定管道上,凡是直徑低于五十毫米的都應當采用螺母進行固定,直徑在六十三毫米的時候則用點焊來固定。明配管的擺放要整齊。在連接塑料管的時候應當采用套管,這樣才可以確保塑料管不會因外力而變形。
(2)解決照明器具問題
螺口燈頭的零線要與螺紋端口連接好,相線要和中點連接好,查看燈的外部有沒有損壞。當吊燈較重的時候,先用螺栓將其固定,確保安全,導線要連接準確,不能觸碰到外殼。
(3)解決插座及開關問題
建筑內的開關、插座和有關的電器都應當要依照設計圖紙來定位,保證誤差在十五毫米之內;所有的開關在開啟的時候都要保證朝下;開關與插座的位置要科學,不能安排在門戶。在進行插座和開關接線的時候,要留下10厘米在箱中。三孔插座要遵循“左零、右火、上地”的原則。而地線要使用塑料保護套線中的一根芯設置,不能為了減少成本而節省材料,不能與其他的線一起鋪設。
3結論
綜合以上論述,水電安裝能夠提升人們的生活質量,假如安裝質量不過關,則會大大影響到人們的正常生活。所以施工方要依照要求施工,并且參考上文分析,在安裝水電的過程中多加注意,確保水電安裝的質量。
【參考文獻】
[1]陳章泉.淺談建筑工程中水電安裝質量管理[J].建設科技,2013(18):212-213.
[2]楊泉.建筑工程水電安裝的質量控制技術淺析[J].中國高新技術企業,2013(25):131-131.
篇9
【關鍵詞】工程施工;水電安裝;工程造價;跟蹤審計
所謂跟蹤審計就是工程造價咨詢單位作為專業的工程造價咨詢機構,受雇于業主,對工程造價的施工過程進行動態的跟蹤過程。對工程造價進行有效審計,可以提高投資效益。對水電安裝工程而言,其在施工階段造價管理上存在著些許問題,在一定程度上影響了水電安裝工程的投資效益。因此,對水電安裝工程施工階段的造價進行跟蹤審計,是整個水電安裝工程造價管理過程中最為重要的一個階段之一,顯得尤為重要,必須要進行認真對待。在此,本文就施工階段的水電安裝工程造價跟蹤審計展開簡要闡述,以供參考。
1 水電安裝工程施工階段造價管理存在的問題
1.1 水電安裝工程造價信息管理相對滯后
就水電安裝工程施工階段而言,其工程造價管理以及信息采集相對比較落后,工程造價信息的采集、加工處理、交流傳輸、共享、增值服務等各個環節的運作水平不高,信息更新慢,致使工程項目中造價信息管理存在著采集標準不一、實時性比較差等問題,難以更好地在水電安裝的造價管理中得到有效應用。由于在造價信息管理過程中,采用電子技術相對較少,在造價管理上還是采用人工處理,這就會存在著一定的人為誤差,導致實際支出和預算差異比較大,從而難以實現對水電安裝工程的造價動態控制,致使水電安裝造價全過程的管理得不到實現。
1.2 水電安裝工程計價方法不夠科學
當前,我國的水電安裝工程都是采用通過預算確定工程造價,也就是按定額計算直接費,按取費標準計算間接費、利潤、稅金,再依據有關文件規定進行調整、補充,最后得到工程造價。這里直接費與間接費的計算依據,分別是參照定額的取費標準。由于在預算過程中主要參照額定的取費標準,但在實際的安裝工程中總是不可避免地出現很多人為的因素、材料的因素以及設備的因素等等,所以,在預算中不可能完全適用規范和標準。
1.3 水電安裝工程造價管理的監督機制尚需完善
在水電安裝過程中,往往會因為競爭項目而導致對造價管理監督不規范,工程審計效果不明顯,不能滿足工程監督的需要。即主要表現為以下幾個方面:(1)審計監督不全面,無論是內部控制還是外部審計監督,均存在著極大的隨意性和盲目性,各自為政、互不配合、權責不清等問題顯著,舍得審計監督不夠全面,導致施工、造價管理、審計相脫節,審計監督質量難以令人滿意。(2)審計方法不配套,一些理論上可行的審計方法不能在實際工程中得以應用。如跟蹤設計主要是對建設項目的竣工結算進行審計,全面審計仍然難見實效,效益審計淪為空談等等。另外,當前我國審計方面的法律法規仍不健全,這也不利于審計發揮監督效應。(3)工程審計人員是審計工作的直接執行者,其綜合素質也決定了審計工作質量。但當前很多建筑審計人員只是結構相對單一,大多只是具備工程、審計、會計知識的一個方面,復合型人才嚴重缺乏,難以真正發揮出審計的監督效應。
2 造價跟蹤審計在工程施工階段的相關概述
2.1 跟蹤審計的原則
在開展跟蹤審計工作時,必須要對工作的目標加以明確,并進行合理的定位。一般,工程跟蹤審計工作需要遵循的原則有:(1)對于工程建設項目的進度、質量、投資,在跟蹤審計時必須要對具體的要求加以明確,并圍繞工程建設的目標來開展工作,且在對各建設目標進行分析和評價時應使各建設目標處于平衡狀態;(2)在審計的過程中,要把投資控制作為中心,對建設資金的運用進行監督,對投資的情況進行控制;(3)在工程施工階段的跟蹤審計過程中,應用價值工程理論來優化設計方案和施工方案,提出較為合理的建議,從而最大限度的把投資效益發揮出來。
2.2 跟蹤審計的內容
2.2.1 從造價角度協助承、發包方進行施工組織總設計的合理優化。
2.2.2 嚴格控制材料用量,合理確定材料價格。材料價格是影響工程成本的重要因素,嚴格控制材料價格是降低造價的有效手段。在保證材料質量的基礎上,跟蹤審價人員要嚴把材料價格關,即要審核施工單位提供的材料發票。對于一般材料,可根據材料供銷商、材料規格通過市場詢價來確定;對于特殊材料,可由造價咨詢機構組織甲乙雙方共同向不同的供應單位詢價,以便審計人員能隨時掌握最新的投資額度。
2.2.3 為業主制定合理的資金使用計劃,確保資金專款專用,做到按工程進度付款,對是否超出批準的概算范圍投資、擠占或者虛列工程成本這些問題的存在進行審計,以防止出現超付工程款現象。
2.2.4 工程變更、洽商、簽證的確認:工程變更發生的費用是工程造價的重要組成部分。對施工過程中必要的變更應首先進行技術經濟比較,選擇經濟合理的技術措施,力求減少變更費用,以避免不合理支出。同時,審計人員應協助業主及時審核設計變更單、現場簽證等發生的費用,相應調整造價控制目標,并協助業主做好各種不可預測因素導致索賠事件的預案,盡可能在事件發生后將損失降到最低限度。
2.2.5 按照項目招標文件以及合同并結合現場的形象進度,來對施工單位上報的由監理審核過的月進度款支付計量報表進行核實。
2.2.6 為業主做好承包商月報造價以及各種工程驗收資料的復核,并使其做到項目一完工,資料也能夠及時且完整的進行上報,從而達到順利通過竣工驗收的目的。
3 做好水電安裝工程造價跟蹤審計的相關對策
3.1 合理分割工程的基本預算以及成本,優化資金和資源的分配
資源的合理分配是造價管理的一個基礎,只有在水電安裝的過程中進行合理的把有限的資源分配的不同工序和責任人的手中,才能達到用最少的錢來把目標完成的目的。
3.2 嚴格對施工過程進行監管
對施工過程進行有效地監管,可以有效控制工程資源的使用,防止浪費現象的產生,從而對工程造價管理的合理性進行保證。一般,在施工過程的監管重點是施工隊的成本管理,也就是對施工隊所完成的施工項目的成本進行嚴格的管理,以期其加強完成水電安裝的效率。在這一過程中,可以采用“責任成本核算”這一監管方式,即把項目的成本細化到每一道水電安裝的工序中,由完成工序所需要的工料機費用組成責任單價,并以此作為對施工隊的成本控制情況的衡量依據。這就是說,責任成本單價與各個施工成員的直接工費收入相掛鉤,一旦責任成本單價過高,則會相應減少施工人員的工費,以此來約束其更好地進行資源的控制。
3.3 嚴格對工程施工階段實行造價動態控制管理
在水電安裝工程中,施工階段工程造價動態控制可大大降低工程費用且最大程度的提高實施效率,使項目獲得最佳進度。因此,需要在工程中實施施工階段工程造價動態控制,及時對照工作的實際進度去檢查和核實各項費用的實施情況,發現預算偏離計劃都必須采取相應措施加以糾正。
目前,“贏得值法”作為一項先進的項目管理技術,其逐漸被我國建筑業引入,用以進行工程項目的費用預算、進度控制。而在應用“贏得值法”進行成本動態控制時,須進行進度/成本實時監測,即其由以下幾部分組成:
3.3.1 建立工作分解結構圖,把水電安裝工程項目的各項任務逐級進行分解,分解任務為若干個相對獨立、內容單一的工作單元,并依據各單元在整個項目中的地位及相對關系制定計劃備案,以在施工過程中配合成本分割計劃進行動態的管理。
3.3.2 建立好工作分解結構圖后,即可依據分解結構圖,估算各工序的費用和時間,然后科學、合理地設置控制節點。
3.3.3 最后,在工作分解結構圖的基礎上,可建立成本分解結構,也就是吧項目成本逐層分解到工作分解結構圖的各級工作包上,以對成本的具體花費進行控制。
4 結束語
綜上所述,工程造價跟蹤審計是一項技術性、專業性很強的工作,它貫穿于建筑施工的全過程及竣工結算等階段,是一個動態的管理過程。在本文中,論述了當前水電安裝工程施工階段造價管理存在的問題,也就跟蹤審計的原則及其內容做了簡要闡述,在文章的后面,本文還從“合理分割工程的基本預算以及成本、嚴格對施工過程進行監管及嚴格對工程施工階段實行造價動態控制管理”闡述了做好水電安裝工程造價跟蹤審計的一些對策,以利于工程造價控制和提高建設資金的使用率。可以說,跟蹤審計管理是工程造價行業發展的必然趨勢,是造價行業適應市場經濟發展的必然結果。
參考文獻:
[1]胡彩宣.施工階段工程造價的跟蹤審計[J].企業科技與發展,2011(19).
篇10
[關鍵詞]水電安裝施工技術 管理
隨著社會主義市場經濟的發展,水電安裝工程技術取得很大的突破;作為建筑工程的一個重要環節,建筑給排水、電氣安裝是建筑工程的有機組成部分,管道的跑、漏、堵、開關不靈敏、漏電等問題均影響功能的正常使用。輕則給人們帶來一些小的不便與煩惱,重則影響建筑物的使用壽命。國家有關部門和地方部門設定了方案,對21世紀的水電安裝行業,務必要牢牢抓住機遇,不斷推進安裝工程施工技術的創新與管理的創新,進一步完善水電安裝的方法,進一步改進建筑水電工程的質量。下面從以下幾個方面來說明水電安裝工程施工技術和管理。
一、對水電施工圖紙的審核
審核圖紙是工程施工技術準備工作的一項重要內容,審核圖紙也是施工的重要依劇所在,只有對施工的圖紙詳細并仔細的審核,才能使施工中各系統以及各個環節做到心中有數,這樣才能及時的找出問題,發現問題,又能及時的改正錯誤,糾正錯誤。平面圖是否與系統圖相同,做到對施工質量的預控。施工人員一拿到圖紙后,先查看圖紙是否齊全,并根據專業施工的需要做第二次查看。在施工過程中,避免有缺圖的出現,造成停工現象的發生。查看設計中的圖紙是否有其它規范的規定以及技術標準要求。對預留圖紙的繪制,現場的預留要做好,施工在實體中,要求嚴格根據預留、預埋的詳圖進行預留、預埋。應根據預留、預埋的詳圖嚴格細致地進行檢查。
二、施工中組織設計內容的編制和要求
“施工組織設計”是一份引領施工安裝的重要文件。施工中都是通過“施工組織設計”的要求來安排實施的。但是目前普遍存在的問題是“施工組織設計”缺乏針對性及操作性。要真正做到引領施工,編制的內容要做到以下幾點:
1、工程概述
簡單抄寫設計說明是毫無意義的,應該把整個工程的建筑形式介紹的清清楚楚。打個比方:房屋建設工程的樓層高和房屋結構做法,一般都注重房間的衛生間與廚房間的做法,但要交待清楚,另外對工程承包的范圍以及施工特點做進一步的介紹。編制內容的依據必須是有效的施工協議,施工的圖紙。
2、施工前的準備
(1)技術準備,體現了技術的先進,里面涵蓋了會審的圖紙、編制施工組織內容以及技術方面的內容。圖紙的審核要根據自已審核專業圖紙的情況下,提出明確的要求。 (2) 物質準備,要清楚材料及設備采購的地點、供應的方法,選用的設備和小型工具的數量以及計劃按排進場的時間。(3)施工現場準備,因為水電都是分包工程,必須向總承包單位提出所需要的材料以及堆放的場地,現場的休息和辦公用房。(4)施工人員,明確管理人員及施工班組的組成。
3、施工技術的方案
施工技術方案是“施工組織設計”的重要組成部分,也是施工組織設計中最核心的內容之一,根據施工分成幾項工程來編制,按照施工的特點,尤其需要強調對工序搭接的問題,以及要重點控制的部分,如輕質墻上管道器具怎樣穩裝,保溫墻上散熱器及管道電盒如何固定牢固。
4、施工進度計劃
不能盲目的根據土地建設的進度把它編制出來,應該按照本設計施工中所需用的工序搭接,以及按照短期性工期要求、總工期要求進行安排。要妥善合理的安排好施工的順序及工序如何搭接;勞動的用工數都是通過勞動定額計算出來的,工序搭接的合理是通過組織人員編制策劃出來的,工作小組要穩定,工程要保質保量,生產效率要提高,把工期縮減到最短,施工進度計劃圖表要求畫出來,由預算員在編制時提供工程量和用工的天數,進度計劃圖表要求計劃員畫出來,再由技術人員進行總結。
二、加強水電安裝和施工的技術管理
1、對施工組織進行嚴格管理。施工的方法方案是重要的一個環節,對工程的質量保證至關重要。在工程開始動工之前,對設計圖紙,工程技術人員應該要非常的重視,要做到自己嚴格審核。對復雜的線路及交叉口多的地方進行重點審查并做再次審查,施工方案的合理性、實用性及對工程質量的預控能力,工作人員要注意。從施工方案編制的角度看,工作人員要深度的去領會,確保工程質量的嚴格性。
2、嚴格對材料和設備的質量控制。保證工程質量取決于材料設備的質量,設備的缺陷是無法通過施工過程安裝來改正和彌補的。所以,安裝施工工程質量的第一個關鍵點是選好設備材料。材料進入施工場地時,施工人員應對材料進行抽樣檢驗,嚴格把好原材料質量關,采購進場的設備以及原材料應該有廠家的質量合格證,原材料應該符合國家標準,不合格的嚴禁進入施工場地,切勿使用,如沒有對原材料查出,紕漏,一旦施工途中出現問題,要求材料供方所賠。
3、加強溝通協調工作。溝通是施工當中最重要的帶,做好溝通和協調是施工人員和技術人員所具備的。工作要全面的考慮各方面注意的問題、制訂的方案、技術措施,施工人員以及技術人員平時多交流,并使施工的任務更明確化,使工程質量得以保證。如客廳、房間等做樣板是按設計圖來的。對樣板的施工,可以及時發現問題,在施工中盡量避免問題,以便對工程質量造成不良的影響,趕不上施工的進度。
4、水電安裝與土地建設應該相互配合協調。水電安裝施工的重要基礎是土地建設,土地建設的質量好壞對水電的安裝和施工產生重要的影響。水電安裝與土地建設相互協調配合,是施工整體工程質量得到肯定的前提,技術人員和施工人員應該在施工前,對圖紙仔細認真的審核,施工中對出現的問題,應該加以處理解決。施工實行后,要不定時的與土地建設人員開會互相溝通,對出現的問題進行探討,兩者的問題要協調好,從而使兩個在施工方法上和標準質量上要相符合,確保安裝水電和施工工程的質量能夠正常有序的運行。
5、嚴格制定質量的檢驗標準。在施工階段,水電安裝要嚴格認真地對施工工序交接的檢驗,并對制度的實施,上一個工序環節不符合要求就不能緊接著下一個工序。各種施工抽樣試驗以及隱性的檢驗工作要做好,都是通過國家標準的項目質量進行檢驗的,施工過程中檢測次數要進一步增加以及更全面性,將原先不定時的抽查改為全面的檢測,如有發現問題及時通知上級領導立即整改,不能延誤。